Filtered By: Serbisyopubliko
Serbisyo Publiko
LIST

Road reblocking and repair schedule for August 23 to 27, 2019


Some roads in Metro Manila have been scheduled to undergo road reblocking and repair from Friday, August 23, to Tuesday, August 27, 2019.

According to the Department of Public Works and Highways, the following roads will undergo road reblocking and repair:

EDSA

  • southbound from Bulacan Street to Philam, 1st lane from center island
  • southbound from Magallanes-Baclaran bus stop to Magallanes-Alabang bus stop, outer lane
  • southbound from Eugenio Lopez Drive to Scout Borromeo (desilting and construction of manhole)
  • northbound from Main Avenue to P. Tuazon, 1st lane from sidewalk

C5

  • southbound from C.P. Garcia Bridge approach B, Taguig City fronting Palar Village

Katipunan Avenue

  • southbound after Boni Serrano tunnel to P. Tuazon Street, truck lane

Quirino Highway

  • eastbound from Theresa Heights and before Belfast, inner lane

Elliptical Road

  • eastbound before Commonwealth Avenue, 7th lane from outer sidewalk

The DPWH said the road reblocking and repair started on Friday, August 23, at 11 p.m.

It will end at 5 a.m. on Tuesday, August 27.

Motorists were advised to expect traffic slowdown and to use alternate routes if possible. —KG, GMA News

LOADING CONTENT